Monday, May 11, 2009

Construction Update #2

The Metcalfe Architecture & Design teams leads a group out to the canopy walk as construction of Out on a Limb continues.


At its highest point, the canopy walk soars close to 50 feet above the ground.


Alan Metcalfe pictured at the entrance of the Out on a Limb canopy walk.

No comments:

Post a Comment